Calculation of Cement and Sand Quantity for Plastering

Volume of Sand required (using 1:4 proportion) = 0.036 x 4 = 0.144 x 1600 = 230 kgs (considering sand dry bulk density as 1600 kgs/cum.) Usually around 20% of water by weight of the total dry material is mixed in the mixture to achieve the desired workability.

Contractor Resources

The Documentation of Contract Quantities Guide (or "Documentation Guide" for short) is the documentation section of IDOT's Construction Manual, containing policies which represent the minimum documentation requirements for use by construction personnel for the proper documentation of day to day events as well as contract pay quantities on the state's highway construction projects.

MATERIALS METHOD Subject Code

Materials Methods 10, 10.1, 10.1M, 10.3 Portland Cement Inspection and Sampling of Cement at Batch Plants Materials Method 18.1 Sample Transmittal Instructions MURK Part 1B Construction Inspection Manual Materials Procedure (MP) 09-02 Precast Concrete QC/QA Procedures Materials Procedure (MP) 90-1 Microsilica (711-11) and HRP (711-14) Sampling ...

BACKFILL AND COMPACT TO FULL 1/2R A/C SLOPE 1/2 PER FT.

2.all portland cement concrete (pcc) shall be 4000 psi (6 sacks per cubic yard), 3/4" aggregate. 3.portland cement concrete shall be brush finished parallel to face of curb. 4.all curbs shall be backfilled before street is rocked and paved. 5.class 2 ab, subgrade & fill material shall have a minimum of 95% compaction under curb.

Rate analysis for PCC 1:4:8 (M7.5) - calculate quantity ...

Rate Analysis for PCC 1:4:8 :-It is a summary of all the cost involved in doing particular work or unit work like material cost, labour cost, overhead expenses, water charges & contractor profit.For rate analysis, the details about all the operation involved in carrying out the work should be available. The quantities of materials …

Grades of Concrete with Proportion (Mix Ratio) - Civilology

Concrete grades are denoted by M10, M20, M30 according to their compressive strength. The "M" denotes Mix design of concrete followed by the compressive strength number in N/mm2. "Mix" is the respective ingredient proportions which are Cement: Sand: Aggregate Or Cement: Fine Aggregate: Coarse Aggregate. we already discussed the mix ...

CONCRETE PAVEMENT GUIDE

120.2 MATERIALS 120-6. 120.2.1 Concrete Materials 120-6. 120.2.2 Roller Compacted Concrete (RCC) 120-9. 120.2.3 Concrete Repair Materials and Specifications 120-10. 120.2.4 Joint and Crack Seal Materials 120-13. 120.3 OTHER CONSIDERATIONS 120-13

CONCRETE CULVERT DESIGN AND DETAILING MANUAL

8.4 Skewed End Culverts ..... 139 8.4.1 Details of Skewed End Culverts ..... 139 8.4.2 Concrete Quantity Adjustment for Skewed End Culverts ..... 139 8.4.3 Reinforcing Steel …

PCC Volume Calculator | Free Estimate of Cement, Sand, Jelly

Plain Cement Concrete (PCC) is composed mixture of cement, aggregates, sand, water and chemical admixtures. Calculate portland cement concrete or PCC concrete mix design ratio in Cft and determine exactly how much quantity of cement, sand and aggregate is required for PCC construction.

ADDENDUM NO. ONE (1)

2. Revised Summary of Quantities 3. C109-1 PCC Joint Layout Exhibit 4. Revised Grading & Drainage Plan Concrete Apron, Sheet C135-2 5. Retaining Wall Profile, Sheet C202-2 6. Revised Drainage Details, Sheet C503-2 7. Revised General Notes, Legend, and Abbreviations, Sheet E001-3 8. Revised Apron Parking Lot New Work Plan, Sheet E102-3 9.

How to Calculate Steel Quantity from Drawing | BBS of Slab ...

3.46. 0.12. 1.85 cu m. B = 3 + 0.23 + 0.23 = 3.46. (See drawing in to in dimension (without the wall) of the slab is given 3 m x 4 m. For calculating Quantity of slab concrete we have to calculate out to out the dimension of the slab.) 2.

Cement Concrete Calculator | PCC Calculator | RCC ...

Strength of PCC is defined as compressive strength after 28 days, expressed as M15, M20, where M stands for Mix and 15 stands for 15 N/mm 2 (n/mm 2 must be read as 'Newton's per millimeter Cubic') compressive strength at 28 days. The proportions of materials (cement, sand, coarse aggregate) for nominal mix/design mix concrete that are normally used are 1:3:6 or 1:4:8.

RATE ANALYSIS OF CONSTRUCTION ITEMS

MATERIAL TAKEOFF for Item BOQ Quantities ----- Sr.No. Item of Work Description Qty Basic Unit Rate Amount ----- 1. Excavation Excavation in Ordinary Soil 500.000 cu.mt 130.13 65064.00 2. PCC M10 P.C.C. 1:3:6 in foundation /

Plain Cement Concrete (PCC)- Work Procedure - The Constructor

Generally 1:2:4 or 1:3:6 mix is used. The measurement of material can be done by weight batching or volume batching. In volume batching, coarse aggregate and sand shall be measured by measuring box of 30cmx30cmx38cm of a suitable size equivalent to one bag cement of 1/30 m 3 or 0.035 m 3. Sand shall be measured on the basis of its dry volume.

Thumb Rules for Highrise Building to guide Civil Engineers ...

PCC 1: 4: 8 =3.4 bags/cum 15. PCC 1:5:10 =2.52 bags/cum 16. PCC 1:3:6 =4.2 bags/cum 17. PCC 1:2:4 =6.02 bags/cum ... The use of local aggregates and recycled materials in concrete makes it a 'green' product, which is requested by environmentally responsible owners. ... Can provide the above thumb rule details with relevant formula how it's ...

Design Guide 6 - USDA

(c) 1.5 if material passing No. 200 sieve is dust of fracture, free of clay or shale. (d) In areas exposed to traffic manufactured sand shall have a minimum ultimate polish value of 8, based on the parent rock.

cement consumption in PCC 1:4:8 and M7.5 - Civil Sir

cement consumption in PCC 1:4:8 and M7.5,h ow to calculate quantity of cement in PCC, in this topic we know about how to calculate quantity of cement in PCC and cement consumption in PCC 1:4:8.we know that we have several grade of concrete like M5, M7.5, M10, M15, M20 and M25 and so more- and water cement ratio for M7.5 grade of concrete.. Generally PCC …

APPENDIX-I QUANTITIES OF MATERIALS FOR COMPLETED …

S.No. Item Unit Material Quantities of Materials Remarks 1 Hard moorum filling Cum Moorum 1.00 cum 2 Rammed sand filling cum sand 1.00 cum 3 Rammed moorum & boulder cum Moorum Boulder 0.40 cum 1.00 cum 4 Rammed moorum and metal (or shingle or gravel) cum Moorum Metal 0.33 cum 1.00 cum 5 Cement mortar 1:2 cum Cement Sand

BILL OF QUANTITIES

PCC 1:3:6 and 40% 75mm down boulder) hill side, including excavation, leveling, backfilling, necessary form works and disposal of surplus earth within 50m lead complete as per drawing. m 10,000.00 3.2 A/R Construct box-drain with clear width 450 mm with 150mm thick base PCC 1:3:6, 300mm thick plum concrete (60% PCC 1:3:6 and 40% 75mm down ...

How to Calculate Quantity Manhole Concrete | Materials ...

PCC [concrete] in floor = Length x breadth x average depth. PCC [concrete] in floor = 3 x 2.5 x [0.25 + 0]/2 = 0.9375 cft. RCC in slab = Length x breadth x thickness – π D 2 /4 x T [because there is a manhole in the slab] RCC in slab = (4.5 x 4 x 0.5) – π (1.5) 2 /4 x 0.5. RCC in slab = 9 – 0.884 = 8.12 cft. PCC [concrete] in floor = 0 ...

What is 1:4:8 foundation PCC? - Quora

Answer (1 of 5): This is the specification in short form for foundation PCC means PLain Cement Concrete 1:4:8 means one part of Cement, two parts of sand and four parts of …

Quantity of cement used in one cubic meter of pcc?

Dec 15, 2011 ... policies for inspection of Portland Cement Concrete (PCC) mixtur .... Unless otherwise specified or directed, the materials used in the ... limited to quantities less than 25 cubic yards (20 cubic meters), and .... one source, which cannot be differentiated by the …

Estimating and-costing - SlideShare

a) C.C. (1:4:8) usy 40mm HBG metals for 30m3 of work b) RR masanry in CM(1:5) very 0.34m3 of CM for 1m3 of masanry for 20mof work sol : a) Quantity of Cement required = 13 1 ×1.52×30× 50 1440 =101bags b) 1m3 of RR masanry = 0.34m3 of CM (1:5) 20 m3 of RR masanry required = ? 20x 0.34=6.8m3 Quantityofcementrequired = 5 1 ×6.8× 50 1440 =39 ...

How much cement, M-sand, steel and how many bricks are ...

Answer: if its a RCC slab, than in 100 sqft=8bags cement (1bag is of 50 kg ie. 400kg cement) sand is just 3% of cement therfor 400kg cmt x 3%= 1200kg sand. and …

Construction Updates: DETAIL AND GENERAL SPECIFICATION …

The maximum permissible limits for solids shall be as per IS 456:2000 Clause 5.4, Page No 15. PROPORTION. Proportioning of cement, sand and coarse aggregate shall be 1:2:4 or as specified. Coarse aggregate and sand shall be measured by measuring box of 30cmx30cmx38cm of suitable size equivalent to one bag cement of 1/30 m 3 or 0.035 m 3.

How to Calculate Quantities of Cement, Sand and Aggregate ...

Step-1: Calculate Volume of Materials required. Density of Cement = 1440 kg/cum (Approx) Volume of 1 Kg of Cement = 1/1440 = 0.000694 cum. Volume of 01 bag (50 kg) of cement = 50 X 0.000694 = 0.035 cubic meter (cum) Since we know the ratio of cement to sand (1:2) and cement to aggregate (1:4)

Building Materials Calculators - Apps on Google Play

Download the building materials calculators app to estimate the right quantities. Available calculators are. Excavation. PCC Estimators. RCC Estimators. TMT Steel to Rods. TMT Rods to Steel. Bricks Calculators. Block Calculators.

ESTIMATION AND COSTING (A70138)

1.4 METHODS OF TAKING OUT QUANTITIES The quantities like earth work, foundation concrete, brickwork in plinthand super structure etc., can be workout by any of following two methods: a) Long wall - short wall method b) Centre line method. c) Partly centre line and short wall method. 1.4.1 LONG WALL-SHORT WALL METHOD

Labor contractor rates in bangalore is Rs 250 to 350 / sq ...

PCC 1:4:8 4" thicknesses for the foundation. Size stone masonry 6 courses for foundation footings. Plinth concrete 5" thickness. Inside Floor PCC 5" Thickness. 9" and 4" thickness brickwork for walls. Door and Window Frames Fixing. Lintel concreting. Roof concreting. Inside …

How to Calculate Quantity of Straight Wall | Building a ...

Also Read: Learn to work out quantities of bricks in a wall. Height from ground level upto PCC + Height of PCC = 20 + 30 = 50 cm or 0.50 meter. Now quantity of excavation work = Length x Breadth x Height = 6.40 x 0.70 x 0.50 = 2.24 m3. In second step, calculation is done for concrete in the ratio of 1:4:8.

pcc ratio 1:4:8 cement quantity - huntdaily.com

Notice: Undefined index: EasyPostViewCounter_2207 in /home/mdisario/public_html/huntdaily.com/wp-content/plugins/easy-post-view-counter/EasyPostViewCounter.php on line 24

Designing and Proportioning Normal Concrete Mixtures ...

mining the quantities of concrete ingredients, using local ... Water to cementitious materials ratio 60 50 40 30 20 10 0 8 6 4 2 0 28-day compressive strength, MPa Air-entrained concrete 28-day compressive strength, 1000 psi ... 4 in. to 1 in. Adapted from ACI 211.1 and 1.3.

Project Management for Construction: Cost Estimation

The work items in this project include (1) drilling exploratory bore holes at 50 ft intervals for grout tubes, and (2) pumping grout into the voids of a soil layer between 4 and 6 ft thick. The quantities for these two items are estimated on the basis of the landfill area: 8 acres = (8)(43,560 ft 2 /acre) = 348,480 ft 2